|
Depending on the scope of your project, some or all of
the tasks listed below may be required of your project
manager: |
| |
|
Permits |
-
Zoning
research / Pre-permit approval
-
Flag/Height Test
-
Variance
-
Engineered drawings as required
-
Permitting
-
Schedule
sign inspections
-
Footing
inspections
-
Final
inspections
|
| |
|
Site Surveys |
| |
|
Landlord
approval |
|
 |
|
Production
drawings |
-
Material
specifications
-
Fabrication information
-
Sign
placement
-
Job site
information
|
| |
|
Production |
-
Monitor
production with weekly production
meetings
-
Coordinate location of underground
utilities (ULOCO)
-
Coordinate installation or shipping
|
|
|
 |
| |
|
Proprietary Material - Images are for presentational purposes ONLY and may not be used
for any other purpose without the express written permission of Rite Lite
Signs, Inc. |
|
Site Design and Graphics Copyright © 2001-2008. All rights reserved. |
| |